Y Series Three Phase Asynchronous Motor

Y Series Three Phase Asynchronous Motor

Y collection Three – Stage Asynchronous Motor

Y sequence motor is completely enclosed and fan-cooled, three section squire cage induction motor,that is recently developed in conformity with the pertinent specifications of IEC expectations.
Y sequence motor have excellent overall performance,this sort of as substantial performance, vitality-saving,high starting torque,minimal sounds,little vibration, dependable procedure,easy servicing,and so on.
Y collection motors are commonly used in locations where not exists flamable, explosive or corrosive fuel, and CZPT any particular specifications,these kinds of as machine instruments, pumps, fans,transportation machinery,mixer,agriculture machinery,foods machines, and many others.

Frame: eighty ~ 355           Power: .fifty five ~ 355KW

Functioning method: S1     Insulation course: F

Applicable to: all areas and no particular needs of machinery, such as metal chopping device equipment, pumps, enthusiasts, transportation machinery, mixers, agricultural equipment, food equipment.

Attributes: Insulation class for the B-class, enclosure protection class IP44.

Circumstances of use: no much more than 1000M above sea amount. Ambient temperature changes with the seasons, but the greatest does not exceed +40 ºC, the minimum not less than -15 ºC.

Efficiency Info

  Design Energy
(KW)
Rated Existing
(A)
Rotating pace
(RPM)
Performance
(%)
Electricity aspect Stall torque
Rated torque
Stall present
Rated current
Highest torque
Rated torque
Synchronous speed3000r/min
Y80M1-two .75 1.8 2825 seventy five. .eighty four two.two six.5 two.3
Y80M2-two 1.1 2.five 2825 seventy seven. .86 two.two seven. 2.three
Y90S-2 one.5 three.four 2840 seventy eight. .eighty five 2.2 seven. 2.3
Y90L-2 2.two four.8 2840 80.5 .86 2.2 seven. 2.3
Y100L-2 three 6.4 2880 82.5 .87 2.two 7. 2.three
Y112M-2 four 8.2 2890 85.five .87 two.2 7. two.three
Y132S1-2 5.five 11.one 2900 85.5 .88 2. 7. 2.three
Y132S2-two 7.5 fifteen. 2900 86.2 .88 two. seven. two.three
Y160M1-2 11 21.8 2930 87.two .88 2. seven. two.3
Y160M2-two fifteen 29.four 2930 88.two .88 2. 7. 2.3
Y160L-two 18.five 35.5 2930 89. .89 2. seven. 2.two
Y180M-two 22 forty two.two 2940 89. .89 two. 7. two.two
Y200L1-two 30 56.nine 2950 ninety. .89 two. seven. two.2
Y200L2-two 37 69.8 2950 90. .89 two. seven. two.2
Y225M-2 45 84. 2960 90.five .89 2. 7. 2.two
Y250M-two 55 103 2960 ninety one.5 .89 two. 7. 2.two
Y280S-two seventy five 139 2970 92. .89 two. seven. two.2
Y280M-two 90 166 2970 ninety two.5 .89 2. 7. two.2
Y315S-2 one hundred ten 203 2980 ninety two.5 .89 one.eight 6.8 2.2
Y315M-2 132 242 2980 93. .89 one.8 6.eight 2.two
Y315L1-2 one hundred sixty 292 2980 93.5 .89 one.8 six.8 2.two
Y315L2-two two hundred 365 2980 ninety three.five .89 1.eight six.eight two.two
Synchronous speed1500r/min
Y80M1-4 .fifty five 1.5 1390 73. .76 2.4 six. 2.3
Y80M2-4 .75 two. 1390 74.5 .seventy six two.3 six.five 2.3
Y90S-4 1.one 2.7 1400 seventy eight. .seventy eight two.3 6.five two.3
Y90L-4 one.five 3.7 1400 19. .seventy nine 2.3 seven. 2.three
Y100L1-four two.two five. 1420 81. .82 2.2 7. two.three
Y100L2-4 three six.eight 1420 82.five .eighty one two.two seven. 2.3
Y112M-4 4 6.eight 1440 eighty four.5 .eighty two 2.2 seven. 2.three
Y132S-4 five.five 11.6 1440 eighty five.5 .eighty four two.2 seven. 2.3
Y132M-four seven.5 15.4 1440 87. .85 2.two seven. two.3
Y160M-four eleven 22.6 1460 88. .84 2.2 7. two.three
Y160L-4 15 thirty.three 1460 88.5 .eighty five 2.2 seven. two.3
Y180M-four 18.five 35.9 1470 ninety one. .86 2. 7. two.2
Y180L-4 22 42.5 1470 ninety one.5 .86 two. seven. two.2
Y200L-four 30 fifty six.8 1470 92.two .87 two. 7. two.two
Y225D-4 37 70.four 1480 ninety one.eight .87 1.nine seven. two.2
Y225M-four forty five eighty four.two 1480 ninety two.3 .88 one.9 7. 2.2
Y250M-four fifty five 103 1480 92.six .88 two. 7. 2.two
Y280S-four seventy five a hundred and forty 1485 92.seven .88 1.9 seven. 2.2
Y280M-4 90 164 1485 93.five .89 1.nine 7. 2.two
Y315S-four a hundred and ten 201 1485 93.5 .89 1.eight six.8 2.two
Synchronous velocity 1000r/min
Y315M-four 132 240 1485 ninety four. .89 1.eight six.eight 2.2
Y315L1-4 one hundred sixty 289 1485 ninety four.five .89 1.eight 6.8 2.two
Y315L2-four 200 361 1485 ninety four.five .89 one.8 6.eight 2.two
Y90S-six .seventy five 2.2 910 seventy two.five .70 2. five.5 two.2
Y90L-six 1.one three.2 910 seventy three.5 .seventy two two. five.five two.2
Y100L-six one.five 4. 940 seventy seven.5 .74 2. six. two.two
Y112M-6 2.2 5.six 940 eighty.five .74 two. 6. two.2
Y132S-6 three 7.two 960 83. .76 2. 6.five 2.2
Y132M1-6 four nine.four 960 84. .77 two. six.five 2.2
Y132M2-6 five.5 12.6 960 85.three .seventy eight 2. 6.5 two.2
Y160M-6 7.5 17. 970 86. .78 2. six.5 two.
Y160L-6 eleven 24.6 970 87. .seventy eight two. 6.5 2.
Y180L-six fifteen 31.4 970 89.five .81 one.eight six.five 2.
Y200L1-6 eighteen.8 37.seven 980 89.eight .eighty three 1.eight 6.five two.
Y200L2-6 22 forty four.6 980 90.2 .83 1.eight six.5 two.
Y225M-six 30 fifty nine.5 980 90.2 .85 one.7 6.5 two.
Y250M-6 37 72. 980 ninety.eight .86 one.eight six.5 two.
Y280S-6 45 eighty five.four 985 ninety two. .87 1.eight 6.5 2.
Y280M-six 55 104 985 ninety two. .87 1.eight six.5 2.
Y315S-6 75 141 990 ninety two.8 .87 one.six 6.5 2.
Y315M-6 ninety 169 990 93.two .87 1.6 6.five 2.
Y315L1-six a hundred and ten 205 990 ninety three.five .87 1.six 6.five 2.
Y315L2-6 132 246 990 ninety three.5 .87 1.six 6.five two.
Synchronous speed 750r/min
Y132S-8 2.2 5.8 710 80.six .71 two. 5.five two.
Y132M-8 3 seven.seven 710 82. .seventy two two. five.five 2.
Y160M1-8 four 9.9 720 eighty four. .73 two. six. 2.
Y160M2-8 five.five 13.3 720 eighty five. .74 2. six. two.
Y160L-eight 7.five seventeen.7 720 86. .seventy five 2. five.five 2.
Y180L-8 eleven 24.eight 730 87.5 .seventy seven one.seven 6. two.
Y200L-eight fifteen 34.one 730 88. .seventy six 1.eight six. 2.
Y225S-eight 18.5 forty one.3 735 89.five .seventy six one.seven 6. two.
Y225M-8 22 47.six 735 ninety. .78 1.8 6. 2.
Y250M-eight 30 63. 735 90.five .80 1.8 six. two.
Y280D-eight 37 seventy eight.2 735 ninety one. .seventy nine one.eight six. 2.
Y280M-eight 45 93.2 735 91.7 .80 one.six six.five 2.
Y315S-eight fifty five 114 740 92. .eighty 1.6 6.five 2.
Synchronous speed 600r/min
Y315M-eight 75 152 740 ninety two.five .eighty one 1.6 6.5 2.
Y315L1-eight 90 179 740 93. .82 one.6 6.five two.
Y315L2-8 110 218 740 ninety three.3 .eighty two 1.six six.five 2.
Y315S-ten 45 one zero one 590 ninety one.5 .seventy four one.four 8. 2.
Y315M-ten 55 123 590 92. .74 one.4 eight. 2.
Y315L1-ten 75 197 590 92.5 .seventy five one.four 6. 2.

Set up framework sort

Frequent set up construction sort, and the applicable body measurement is shown in the table beneath

 Frame

    Simple set up structure        Derived installation variety
B3 B5 B35 V1 V3 V5 V6 B6 B7 B8 V15 V36 B14 B34 V18
sixty three~112
132~160
one hundred eighty~280

Notice: “√” signifies the sort of framework that can be produced

All round Set up Proportions

Frame number The variety of poles Set up dimensions                                                                            Dimensions
A B C D E F G H M N P R S T K AB AC Ad High definition L
80M two.4 a hundred twenty five one hundred fifty 19 40 6 fifteen.five 80 165 a hundred thirty 200 twelve 3.five ten 165 175 a hundred and fifty one hundred seventy five 290
90S two.4.six one hundred forty a hundred fifty six 24 fifty eight twenty ninety one hundred sixty five 130 two hundred 12 305 10 180 195 one hundred sixty 195 315
90L 2.4.6 a hundred and forty a hundred twenty five 56 24 50 eight 20 ninety one hundred sixty five a hundred thirty two hundred 12 three.five ten a hundred and eighty 195 a hundred and sixty 195 340
100L two.4.six 160 one hundred forty sixty three 28 sixty 8 24 100 215 a hundred and eighty 250 15 four twelve 205 215 a hundred and eighty 245 380
12M two.four.6 one hundred ninety a hundred and forty 70 28 eighty eight 24 112 265 230 300 15 four twelve 245 240 one hundred ninety 265 four hundred
132S 2.four.six.8 216 one hundred forty 89 38 eighty ten 33 132 300 230 300 15 4 twelve 280 275 210 315 475
132M two.4.six.eight 216 178 89 38 a hundred and ten 10 33 132 300 250 350 15 four 12 270 275 210 315 515
160M two.four.6.eight 254 210 108 forty two one hundred ten twelve 37 160 300 250 350 19 five 15 330 335 265 385 605
160L 2.four.6.8 254 154 108 42 a hundred and ten twelve 37 160 three hundred 250 350 19 five fifteen 330 335 265 385 650
180M two.four.six.eight 279 241 121 forty eight one hundred ten 14 forty two.five one hundred eighty three hundred 250 350 19 five 15 355 380 285 430 670
180L 2.4.6.8 279 279 121 forty eight one hundred ten 14 42.5 180 300 250 350 19 five fifteen 355 380 285 430 710

200L

225M

225S

two.4.six.eight

318

356

356

305

311

286

133

149

149

55 110 16 49

200

225

225

350

four hundred

400

three hundred

350

300

400

450

450

19

19

19

five

five

five

19

19

19

 

395

435

435

 

420

475

475

315

345

345

475

530

530

775
4.eight 60 140 eighteen 53 820
250M two 406 349 168 fifty five a hundred and ten 16 49 250 five hundred 450 550 19 five 24 490 515 385 575 a thousand
4.6.eight sixty one hundred forty eighteen fifty three
280S 2 457 368 190 sixty 140 18 fifty three 280 500 450 550 19 5 24 550 585 410 640 1050
4.6.8 65 a hundred and forty eighteen fifty eight
200M 2 457 419 190 sixty five one hundred forty 18 fifty eight 200 500 450 550 19 5 24 550 505 410 640 1240
four.6.8 75 one hundred forty 20 67.five
315S two 508 406 216 sixty five a hundred and forty 18 fifty eight 315 600 550 660 24 six 28 744 645 576 865 1270
four.6.8 seventy five 140 twenty sixty seven.5
315M 2 508 457 216 sixty five a hundred and forty 18 58 315 600 550 660 24 six 28 744 645 576 865 1310
4.6.eight.10 eighty a hundred and seventy 22 seventy one
315L two 508 508 216 sixty five one hundred forty eighteen fifty eight 315 600 550 660 24 6 28 744 645 576 865 1340
4.6.eight.10 eighty one hundred seventy 22 71

 Installation Proportions

 

Frame  The quantity of poles Installation dimensions                           Dimensions
D E F G M N P R S T Number of flange holes AC Ad HF L
180M 2.4.six.eight forty eight 110 14 forty two.five 300 250 350 19 5 4 380 285 500 730
180L two.4.6.eight forty eight 110 fourteen 42.5 three hundred 250 350 19 five 4 380 285 five hundred 770
200L 2.4.6.eight 60 110 16 49 350 three hundred 400 19 5 4 420 315 550 850
225S 4.eight 55 one hundred forty 18 53 400 350 450 19 five eight 475 345 610 910
225M two sixty 110 16 49 four hundred 350 450 19 5 8 475 345 610

935

250M 4.six.8 sixty one hundred forty eighteen fifty three five hundred 450 550 19 5 eight 515 385 650 1035
two sixty five 140 eighteen 53
280S four.six.8 sixty five a hundred and forty 18 fifty eight 500 450 550 19 5 8 580 410 720 1120
2 seventy five 140 18 58
280M four.six.eight sixty five a hundred and forty 20 67.five 500 450 550 19 five eight 580 410 720 1170
2 75 140 eighteen 58 1360
315S two sixty five one hundred forty 18 fifty eight 600 550 660 24 6 8 580 410 720 1360
4.six.eight.10 eighty 140 twenty sixty seven.five 1390
315M 2 65 140 eighteen 58 600 550 660 24 6 8 645 576 900 1460
4.6.8.ten eighty one hundred seventy 22 71 1490
315L 2 65 a hundred and forty eighteen 58 600 550 660 24 6 8 645 576 900 1460
4.6.eight.10 80 a hundred and seventy 22 71 1490

PRODCUTION DETAILS 

Factory OUTLINED Looking :

Edge:
Pre-sales support: 

•We are a revenue crew, with all technological assistance from engineer crew.
•We worth every inquiry despatched to us, make certain fast competitive supply inside of 24 several hours.
•We cooperate with buyer to design and style and develop the new items. Give all necessary document.

Following-sales service:
•We regard your feed again following acquire the motors.
•We provide 1years guarantee right after receipt of motors..
•We promise all spare areas CZPT in life time use.
•We loge your complain within 24 hrs.

Y Series Three Phase Asynchronous Motor

Tags: